Sound Test Checklists

Before we come and carry out a Sound Test we need you to check that the following details have been completed, otherwise you may fail your test or worse still we may not even be able to complete the test.

Floor Checklist

  • Ensure all doors are fitted and working correctly
  • Ensure all windows are fitted and working correctly
  • Ensure all electric fittings are fitted and working
  • Ensure 240Volt power is available in each room
  • Ensure no carpets or laminated flooring is fitted on 1st floor levels or above
  • Ensure Skirting does not touch Floating Floor
  • Ensure all gaps are sealed in walls and floors
  • Ensure we have access to all rooms on all levels
  • Ensure and building work is stopped during entire duration of test
  • Ensure both properties are vacated during the duration of test
  • Ensure any noise sources are turned off eg radios fire alarms etc.

Wall Checklist

  • Ensure all doors are fitted and working correctly
  • Ensure all windows are fitted and working correctly
  • Ensure all electric fittings are fitted and working
  • Ensure 240Volt power is available in each room
  • Ensure all gaps are sealed in walls and floors
  • Ensure we have access to all rooms on all levels
  • Ensure and building work is stopped during entire duration of test
  • Ensure both properties are vacated during the duration of test
  • Ensure any noise sources are turned off eg radios fire alarms etc.

Here at part-e-testing.co.uk we can offer advice and consultancy on all aspects of sound testing related to Part E testing. Contact us for more information.